Introduction | The comprehensive resource utilization project of livestock and poultry manure in Zhalantun City, Inner Mongolia, is constructed by Zhonghai Environment in a "general contracting+operation" model. The project covers an area of 8767.38 square meters and has a total construction area of 2764 square meters. A total of 7 organic waste treatment centers will be built, with an annual output of 20000 tons of organic fertilizer and 2000 acres of black soil protection completed. The project adopts a decentralized+centralized treatment mode, equipping large-scale breeding farms with organic fertilizer fermentation and production equipment to achieve on-site treatment of livestock and poultry manure. Centralize the collection and storage of livestock and poultry manure from surrounding small-scale farms to the treatment center, with seven livestock and poultry manure resource utilization and treatment centers in Gaotaizi Town, Dahewan Town, Genghis Khan Town, Haduohe Town, Qianjin Village, and Daur as the central points, radiating to the farms in the Zhalantun area. |
Processing mode | Centralized+decentralized processing mode |
Equipment matching | Construct 7 regional processing centers, complete equipment support for 104 breeding farms, 32 sets of NCS intelligent molecular membrane fermentation systems, 7 complete sets of organic fertilizer deep processing production lines, and 1 fertilizer spreader for returning farmland. |
Project benefits | 50 employment opportunities will be created for surrounding villagers, and organic fertilizers can increase the organic matter content by 1% for 50000 acres of land. The construction rate of large-scale breeding facilities will reach 100% for livestock and poultry manure, and the comprehensive utilization rate will reach 93%. |
Partial display |
Copyright © 2023-2024 Qingdao Zhonghai Environmental Engineering Co., Ltd. Record number:鲁ICP备20013595号